The NWRB will further reduce the raw water allocation from Angat Dam for Maynilad starting June 27. As a result, Maynilad is constrained to implement NEW ROTATIONAL WATER SERVICE INTERRUPTIONS, throughout our concession area to maximize the limited supply and ensure that all customers will have some water supply daily.

Our customers in portions of Brgys. CAA, Manuyo Dos (BF Martinville, Tionquiao, Woodsrow 3 Canaynay Road), Pulanglupa Dos (Airmens Subdivision, Camella, Casimiro J. Aguilar, Casimiro Townhomes, Cittadella Executive Village, Country Homes, DBP Subdivision, Don Angelo King 1 & 2, Las Piñas Royale Subdivision, Martinville Subdivision, Naga Road, San Antonio Valley, St. Joseph Subdivision, Villa Celina, Villa Jacinta, Woodridge Subdivision) and Talon Uno (Emapalico Subdivision), Las Piñas City will have low pressure to no water supply daily, starting June 27 between 08:00 am and 01:00 am (next day) until rains replenish the Angat Dam, and allocation for Maynilad is restored.
Portions of Brgys. Anabu II-D (Ayala Mall), Anabu II-E (Ayala Mall, Landtrust), Anabu II-F (Landtrust), Malagasang I-F (Tiera Vista), Malagasang II-A (Malagasang, Daang Hari), Malagasang II-B (Malagasang, Daang Hari), Malagasang II-C, Malagasang II-D, Malagasang II-E and Malagasang II-G, Imus City, Cavite will have low pressure to no water supply daily, starting June 27 between 12:00 nn and 05:00 am (next day)
Portions of Brgys. Bayanan, Molino I to IV, VI and VII, Queens Row Central, Queens Row East, Queens Row West and San Nicolas III, Bacoor City, Brgys. 1 to 10, 10-A and B, 11 to 42, 42-A and B, 43 to 62, 62-A, Fort San Felipe (Phil. Navy) and Sangley Point, Cavite City, Brgy. Pasong Buaya, Imus City, Brgys. Magdiwang, Poblacion, Salcedo I and II, San Antonio I and II, San Juan I and II, San Rafael I to IV and Santa Rosa I and II, Noveleta and Brgys. Bagbag II, Kanluran, Muzon I and II, Poblacion, Sapa I, II and IV, Silangan I and II, Tejeros Convention and Wawa I to III, Rosario, Cavite will have low pressure to no water supply daily, starting June 27 between 11:00 am and 11:00 pm
Portions of Brgys. Habay I to II, Ligas I to II, Mambog V, Niog II to III, Panapaan VII to VIII, Real II, Zapote I to III and  Zapote V, Bacoor City, Brgys. Alapan I-A to I-C, Bucandala III (Alapan 1B-1C 300, Alapan 1B-1C 150), Bucandala IV (Alapan 1B-1C 150), Palico IV, Toclong I-A (Villanueva), Toclong I-B (Villanueva), Toclong I-C (Villanueva), Toclong II-A and II-B, Imus City, Brgys. Balsahan-Bisita, Binakayan-Kanluran, Congbalay-Legaspi2, Magdalo, Pulvorista, San Sebastian and Toclong, Kawit and Brgys. Poblacion, San Jose I, San Jose I, San Jose II, Magdiwang, Noveleta will have low pressure to no water supply daily, starting June 27 between 10:00 am and 05:00 pm
Portions of Brgys. Batong Dalig, Gahak, Kaingen, Magdalo, Marulas, Panamitan, Poblacion, Santa Isabel, Tabon 1, Tabon 2, Wakas 1 and Wakas 2, Kawit and Brgys. San Juan II and Sta. Isabel, Noveleta, Cavite  will have low pressure to no water supply daily, starting June 27 between 06:00 am and 11:00 pm
Portions of Brgys. Anabu I-A to I-F, Bayan Luma I-IX, Bucandala I-V, Carsadang Bago I-II, Malagasang I-A to Malagasang I-D, Malagasang I-G, Poblacion I-A, Poblacion I-B, Poblacion I-C, Poblacion II-A, Poblacion II-B, Poblacion III-A, Poblacion III-B, Poblacion IV-A, Poblacion IV-B, Poblacion IV-C, Poblacion IV-D, Tanzang Luma I-VI and Toclong I-A to Toclong I-C, Imus City, Cavite will have low pressure to no water supply daily, starting June 27 between 06:00 am and 03:00 am (next day)
Portions of Brgys. Anabu I-A to I-F, Bayan Luma I-IX, Bucandala I-V, Carsadang Bago I-II, Malagasang I-A to Malagasang I-D, Malagasang I-G, Poblacion I-A, Poblacion I-B, Poblacion I-C, Poblacion II-A, Poblacion II-B, Poblacion III-A, Poblacion III-B, Poblacion IV-A, Poblacion IV-B, Poblacion IV-C, Poblacion IV-D, Tanzang Luma I-VI and Toclong I-A to Toclong I-C, Imus City, Cavite will have low pressure to no water supply daily, starting June 27 between 06:00 am and 01:00 am (next day)
Portions of Brgy. 8, Caloocan City and Brgy. Longos, Malabon City will have low pressure to no water supply daily, starting June 27 between 08:00 am and 04:00 pm
Portions of Brgys. 21 to 51, 86 to 124 and Balingasa, Caloocan City and Brgys. 33, 34, 187 to 193 and 195 to 197, Manila will have low pressure to no water supply daily, starting June 27 between 06:00 am and 09:00 pm
Portions of Brgys. Almanza Uno, Daniel Fajardo, Elias Aldana, Ilaya, Manuyo Uno, Manuyo Dos, Pamplona Uno, Pamplona  Dos, Pamplona Tres, Pilar, Pulang Lupa Uno, Pulang Lupa Dos, Talon Uno to Singko and Zapote, Las Piñas City will have low pressure to no water supply daily, starting June 27 between 08:00 am and 09:00 pm

Until rains replenish the Angat Dam, and allocation for Maynilad is restored. Affected customers are advised to store water when supply is available. We will continue to monitor dam levels and provide updates on the water supply situation. We apologize for the inconvenience.

For further inquiries, please call the Maynilad Hotline 1626, or visit our social media accounts (Twitter: @maynilad, Facebook: MayniladWater). 

Please be assured that MAYNILAD is continuously finding ways to serve you better.

Thank you.

Posted on June 10, 2019

To manage the quick drawdown of water from our reservoirs due to high water demand, please be advised that we will be implementing service interruption starting 10:00 am until 09:00 pm of June 10.

This will enable us to refill our reservoirs in preparation for peak demand during daytime. Our customers in portions of Brgys. 80 to 85, 132 to 136 and 138 to 155, Caloocan City and Brgys. Acacia, Potrero, Tinajeros and Tugatog, Malabon City

Brgys. 156 to 164 and Baesa, Caloocan City and Brgys. 164, A. Samson, Baesa, Bahay Toro, Balong Bato, Bungad, Damayan, Del Monte, Katipunan, Mariblo, Paltok, Paraiso, San Antonio, Sangandaan, Sauyo, Talipapa, Tandang Sora, Unang Sigaw and Veteran’s Village, Quezon City

Brgys. 587, 588, 598, 599, 600, 601, and Damka area, Manila

Brgys. Bangkal, Magallanes Makati, Pio del Pilar, and San Isidro, Makati City and Brgys. 673, 675-676, 686-695, 702-708, 710-712, 714-716, 719, 721-725, 731-732 and 734-744, Manila

Brgys. 1 to 22, 49, 52 to 80, 86 to 116, 121 to 124 and Balingasa, Caloocan City and Brgy. Longos, Malabon City

will experience low pressure to no water supply until we are able to stabilize supply in our system.

We apologize for the inconvenience. Thank you. 


Posted on March 7, 2019


Posted on February 1, 2019

Please be informed that the low pressure to no water that started last January 22 will be extended until February 15, every 01:00 am to 04:00 am on Tuesdays, Thursdays and Fridays, due to filling up of our Aguinaldo Pumping Station. Affected areas are portions of Brgys. Anabu I-C, Anabu I-D, Anabu I-F, Anabu II-A, Anabu II-B, Anabu II-C, Anabu II-D, Anabu II-E, Anabu II-F, Malagasang I-D, Malagasang I-E, Malagasang I-F, Malagasang I-G, Malagasang II-A, Malagasang II-B, Malagasang II-C, Malagasang II-D, Malagasang II-E and Malagasang II-G, Imus City, Cavite . We apologize for the inconvenience.

Thank you.


Posted on January 28, 2019

We wish to inform you about our maintenance activity at the Villamor Pumping Station that will disrupt the water supply of around 70,000 water service connections in some portions of Pasay and Parañaque City. The activity will be done on 28 January until 29 January 2019.  The activity will have two interruption windows for different areas due to the length of time required to revert the network back to its original condition.  Please see schedule below:

  • 10 PM to 6 AM  – Barangays Moonwalk, Merville, and Sun Valley (Parañaque City), Barangays 181 to 185, and 201 (Pasay City)
  • 10 PM to 1 PM – Barangays Don Bosco, San Martin de Porres, San Isidro, San Antonio, Marcelo Green, and BF Homes (Parañaque City)

Posted on January 24, 2019

ActivityNetwork Maintenance
LocationRomualdez corner UN Avenue Manila
Duration
Start 01:00 am of January 24
End 03:00 am of January 24
Start01:00 am of January 24End03:00 am of January 24
Start01:00 am of January 24
End03:00 am of January 24

Portions of G. Apacible, Paz Street, UN Avenue. D. Romualdez, Belen Street and Gen. Luna Street will temporarily experience water interruption until the activity is completed.


ActivityNetwork Maintenance
LocationQuirino corner Taft Avenue Manila
Duration
Start 01:00 am of January 24
End 03:00 am of January 24
Start01:00 am of January 24End03:00 am of January 24
Start01:00 am of January 24
End03:00 am of January 24

Portions of Taft Avenue, Quirino Avenue, M. Adriatico and Remedios Street will temporarily experience water interruption until the activity is completed.


Posted on January 21, 2019

ActivityNetwork Maintenance
LocationFB Harrison Street corner J Fernando Street, San Rafael, Pasay City
Duration
Start 11:00 pm of January 21
End 03:00 am of January 22
Start11:00 pm of January 21End03:00 am of January 22
Start11:00 pm of January 21
End03:00 am of January 22

Portions of areas bounded by FB Harrison, EDSA, Taft Avenue, and Agtarap Street, San Rafael, Pasay City will temporarily experience water interruption until the activity is completed.

ActivityLeak Repair
LocationE. Rodriguez corner D. Tuazon
Duration
Start 05:00 pm of January 22
End 08:00 pm of January 22
Start05:00 pm of January 22End08:00 pm of January 22
Start05:00 pm of January 22
End08:00 pm of January 22

Portions of Brgys. 336 to 341, 363, 366, 367, 370, 372 to 382, 492 to 497, and 500 will temporarily experience low pressure until the activity is completed.

ActivityLeak Repair
LocationE. Rodriguez corner D. Tuazon
Duration
Start 08:00 pm of January 21
End 10:00 am of January 22
Start08:00 pm of January 21End10:00 am of January 22
Start08:00 pm of January 21
End10:00 am of January 22

Portions of Brgys. 429, 432, 436 to 456, 461, 512 to 515, 517, 519, 520, and 541, Manila will temporarily experience no water supply until the activity is completed.

ActivityLeak Repair
LocationE. Rodriguez corner D. Tuazon
Duration
Start 08:00 pm of January 21
End 09:00 am of January 22
Start08:00 pm of January 21End09:00 am of January 22
Start08:00 pm of January 21
End09:00 am of January 22

Portions of Brgys. 311, 315 to 325, 336 to 352, 363 to 382, 462 to 511, 514, 516 to 519, Manila will temporarily experience no water supply until the activity is completed.


Posted on December 5, 2018

NATURE OF WORK :Leak Repair of AV Service Pipe (150mm)
OBJECTIVE :To permanently Decommission Leaking Air Valve Service Pipe
LOCATION :Gen.Luis / Mindanao Extn.
SCHEDULED DATE/TIME :10:00PM of December 10 to 6:00AM of December 11, 2018

During this activity some areas in Caloocan City, Valenzuela City, Quezon City and Bulacan will temporarily experience NO WATER. Please see attached List of Affected Areas.

Affected areas:

Valenzuela City – Brgy. Karuhatan, Punturin, Balangkas, Gen. T. De Leon, Lawang Bato, Ugong, East Canumay, Veinte Reales, Mapulang Lupa, Paso De Blas, Polo-Poblacion, Pariancillovilla, Malanday, Marulas, Malinta, Bignay, Maysan, Lingunan, 165, Wawang Pulo, Canumay West, Parada, Dalandanan, Mabolo, Tagalag, Coloong, Isla, Pasolo.
Caloocan City – Brgy. 165, 166, Llano
Quezon City – Brgy. Capri, Nagkaisang Nayon, Nova Proper
Bulacan – Obando Water District, Meycauayan Water District

List of Affected Areas


Posted on November 27, 2018

NATURE OF WORK :Inspection of Existing MCC Panel of Putatan Water Pump
Station (PWPS) and Putatan Water Treatment Plant
(PWTP) DAF Cleaning
LOCATION :Putatan Water Treatment Plant, Putatan, Muntinlupa City
SCHEDULED DATE/TIME :Cavite, Paranaque, Muntinlupa, and Las Pinas- 12:00 AM
to 10:00 PM of November 30, 2018

The activity will cause LOW PRESSURE TO NO WATER SUPPLY for portions of Cavite,
Paranaque, Muntinlupa and Las Pinas City. Please see attached file for details.

Imus:
BRGY:
Bayan Luma II, Bayan Luma IV, Bayan Luma VII, Anabu I-E, Malagasang I-G, Toclong I-C,
Poblacion II-A, Poblacion III-A, Anabu I-D, Anabu II-A, Toclong I-A, Toclong I-B,
Malagasang II-A, Malagasang II-B, Malagasang II-C, Malagasang II-D, Malagasang II-G,
Malagasang II-E, Bayan Luma IX, Bucandala I, Bucandala II, Bucandala III, Bucandala V,
Malagasang I-A, Malagasang I-B, Bucandala IV, Malagasang I-C, Malagasang I-D,
Malagasang I-E, Malagasang I-F, Bayan Luma VI, Bayan Luma I, Bayan Luma III, Bayan
Luma V, Carsadang Bago II, Carsadang Bago I, Tanzang Luma I, Poblacion I-A, Tanzang
Luma II, Tanzang Luma III, Tanzang Luma IV, Poblacion IV-D, Tanzang Luma V, Tanzang
Luma VI, Poblacion I-B, Poblacion I-C, Poblacion II-B, Anabu I-A, Bayan Luma VIII, Anabu
I-B, Poblacion IV-B, Poblacion IV-C, Anabu I-C, Anabu I-F, Anabu II-B, Anabu II-C, Anabu
II-D, Anabu II-E, Poblacion IV-A, Poblacion III-B, Anabu II-F, Buhay na Tubig, Palico IV,
Pasong Buaya II

Bacoor:
BRGY:
Bayanan, Ligas II, Ligas III, Mambog I, Mambog II, Mambog III, Mambog IV, Molino I,
Molino II, Molino III, Molino IV, Molino VI, Molino VII, San Nicolas I, San Nicolas II, San
Nicolas III, Queens Row East, Queens Row Central, Queens Row West

Paranaque:
BRGY:
Sucat, BF Homes

Muntinlupa:
BRGY:
Buli, Cupang, Alabang, Ayala Alabang, Putatan, Bayanan, Poblacion, Tunasan, & Sucat

Las Pinas:
BRGY:
Almanza Uno, Almanza Dos, Bgy BF International, CAA, Pamplona Uno, Pamplona Dos,
Pamplona Tres, Pilar, Pulanglupa Dos, Talon Uno, Talon Dos, Talon Tres, Talon Kuatro, &
Talon Singko

List of Affected Areas


Posted on November 9, 2018


Posted on October 9, 2018

The low pressure to no water you may be experiencing is due to a facility maintenance activity in La Mesa Pumping Station.

Affected areas are portions of:

Brgys. Bancal and Catanghalan, Bulacan, Brgys. 165(Bagbaguin), 166(Caybiga), 169 and Llano, Caloocan City, Brgys. Capri, Gulod, Nagkaisang Nayon, North Fairview, Nova Proper, San Agustin and Sta Monica, Quezon City, Brgys. 165(Bagbaguin), Balangkas, Bignay, Canumay West, Coloong, Dalandanan, East Canumay, Gen. T. De Leon, Isla, Karuhatan, Lawang Bato, Lingunan, Mabolo, Malanday, Malinta, Mapulang Lupa, Marulas, Maysan, Parada, Pariancillovilla, Paso De Blas, Pasolo, Polo-Poblacion, Punturin, Tagalag, Ugong, Veinte Reales, Valenzuela City.

Expected time of normal water resumption is until further notice. We apologize for the inconvenience.


Posted on October 3, 2018

Maynilad to repair pipe leak along Gen. San Miguel Ave. in Sangandaan, Caloocan City, on Oct. 6; motorists advised to expect heavy traffic

Maynilad Water Services, Inc. (Maynilad) will implement leak repair works on a 750-mm diameter primary line along San Miguel Avenue in Sangandaan, Caloocan City, from 12 midnight until 4 p.m. of October 6, 2018 (Saturday).

During this period, two north-bound lanes along Gen. San Miguel Ave. near corner A.P. Aquino Street (from La Favorita Bakery to Da Best Mart) will be closed to traffic.

To help ease traffic flow, one lane on the south-bound side will be made available for counter-flow traffic, to accommodate vehicles going north toward Letre Road. Motorists are also encouraged to take alternate routes.

Maynilad is closely coordinating with the local government of Caloocan City to manage traffic flow along the project area.

To help ensure public safety, work sites will be fully enclosed by board-up barricades, with appropriate lighting and traffic/warning signs. Motorists and pedestrians passing through the area are also reminded to strictly observe traffic rules and road safety regulations.

As a result of these leak repair works, some Maynilad customers in Caloocan and Malabon will experience temporary water supply interruption from 12 a.m. to 4 p.m. on October 6, 2018. Below are the barangays that will be affected by the service interruption:

  • Barangays 1-14 and 80 in Sangandaan, Caloocan City
  • Barangays Tonsuya and Longos, Malabon City

Maynilad is advising affected customers to store enough water for the duration of the water service interruption. The company will also be deploying two mobile water tankers to deliver potable water to customers.

The repair works involve replacing a segment of the primary line that developed major leaks owing to numerous tapping points for illegal connections.


Posted on September 18, 2018

Maynilad lifts rotational service interruptions today, September 18, 2018

As of 6 a.m. today, Sept. 18, turbidity (or concentration of sediments) in the raw water from Ipo Dam has decreased to manageable levels. This enabled us to increase the water production of our La Mesa Treatment Plants and store water in our reservoirs to supply the water requirement of our customers.

Given this development, Maynilad is lifting the implementation of the rotational water availability schedules today.

We will continue to monitor spikes in turbidity of the raw water from Ipo Dam. Given that erratic weather patterns can bring strong rainfall over the Ipo watershed and can cause the turbidity to increase again, we advise our customers to keep some stored water to ensure that they have stock for their daily needs should circumstances constrain us to again reduce production owing to increased turbidity.


Posted on September 12, 2018

ActivityNetwork Maintenance Activity
LocationRoad 10
Duration
Start 11:00 pm of September 13
End 03:00 am of September 14
Start11:00 pm of September 13End03:00 am of September 14
Start11:00 pm of September 13
End03:00 am of September 14

Portions of Barangay 20, 67, 72 to 74, 79 to 83, 85, 93 to 112, 116 to 120, 122, 123 and 128, Tondo, Manila will temporarily experience no water supply until the activity is completed.


ActivityNetwork Maintenance Activity
LocationAirport Road corner Electrical Road
Duration
Start 11:00 pm of September 17
End 04:00 am of September 18
Start11:00 pm of September 17End04:00 am of September 18
Start11:00 pm of September 17
End04:00 am of September 18

Portions of Brgys. 1, 37, 51, 94, 96, 121127, 137, 149, 150153, 157, 163, 169172, 177, 182, 184197, 202, 210, 211212, 215, 221, 222224, 225, 227, 229234, 237, 238, 241243, 244, 248, 257258, 261, 263, 264269, 272, 279, 283286, 291, 292, 293, 299, and 392, Pasay City will temporarily experience no water supply until the activity is completed.


Posted on September 10, 2018

ActivityNetwork Maintenance Activity
LocationRoad 10
Duration
Start 11:00 pm of September 13
End 03:00 am of September 14
Start11:00 pm of September 13End03:00 am of September 14
Start11:00 pm of September 13
End03:00 am of September 14

Portions of Barangay 20, 67, 72 to 74, 79 to 83, 85, 93 to 112, 116 to 120, 122, 123 and 128, Tondo, Manila will temporarily experience no water supply until the activity is completed.


ActivityNetwork Maintenance Activity
LocationTirona Highway
Duration
Start 11:00 pm of September 11
End 04:00 am of September 12
Start11:00 pm of September 11End04:00 am of September 12
Start11:00 pm of September 11
End04:00 am of September 12

Portions of Barangay Dulong Bayan, habay l, Habay ll, Mabolo l, Mabolo lll, Real l, Salinas, Salinas l, Bacoor City, Barangay Balsahan-Bisita, Batong Dalig, Binakayan-Aplaya, Binakayan-Kanluran, Congbalay-Legaspi, Gahak, Magdalo, Manggahan-Lawin, Pag-asa lll, Pulvorista, Samala-Marquez, San Sebastian, Tabon 1, Tabon 3, Tramo-Bantayan, Kawit, Barangay Medicion II-C, Medicion II-D, Imus Cit and Barangay San Jose I, San Jose II, Magdiwang, Noveleta will temporarily experience no water supply until the activity is completed.


ActivityNetwork Maintenance Activity
LocationReparo Road /Milagrosa / Victoneta
Duration
Start 10:00 pm of September 13
End 04:00 am of September 14
Start10:00 pm of September 13End04:00 am of September 14
Start10:00 pm of September 13
End04:00 am of September 14

Portions of Barangay Potrero, Malabon City and Barangay 48-150 and 152-155, Caloocan City will temporarily experience no water supply until the activity is completed.


Posted on August 17, 2018


Posted on August 16, 2018

To our Valued Customer,

Increased turbidity in the raw water from Ipo Dam has constrained us to reduce water production in our treatment plants. As a result, some of our customers in portions of:

Brgys. Almanza I, CAA, Manuyo I – II, Pamplona I – III, Pilar, Pulanglupa I – II, Talon I – V and Zapote, Las Piñas City will only have water supply available beginning 11:00 pm until 05:00 am from August 14 to August 17.

Brgys. 174-178, Caloocan City and Brgys. Kaligayahan and Pasong Putik, Quezon City will only have water supply available beginning 04:00 pm until 06:00 am from August 14 to August 17

Brgy. Greater Lagro, Quezon City and Bgy. 176, 178-180, 182-187, Caloocan City will only have water supply available beginning 06:00 am until 04:00 pm from August 15 to August 17.

We are continuously monitoring the raw water quality in Ipo Dam and conducting the necessary system adjustments to optimize the limited supply. We apologize for the inconvenience.

Thank you.

Maynilad


Posted on August 15, 2018

 Interconnection activity along EDSA -Shaw, Mandaluyong City

Description of Activity

NatureInterconnection of 800mm steel pipe in preparation for decommissioning of the old leaking pipe
Location of ActivityEDSA corner Shaw Blvd, Mandaluyong City
Date and Time of ActivityAugust 16, 2018 at 7:00 PM to August 17, 2018 -9:00 AM
Background of ActivityThe objective of the activity is to decommission the old leaking pipe by interconnecting the newly laid pipe, which will entail temporary service interruption in identified areas.

Customer Impact

Effect on CustomersTemporary water interruption (No Water) from August 16, 2018 7:00 PM- August 17, 2018 9:00 AM
Specific Areas AffectedMunicipality: Quezon City

 

Barangays Affected:

Kaunlaran, Bagong Lipunan, Pinagkaisahan, Horseshoe, Valencia, Immaculate Concepcion, San Martin De Porres, Ugong Norte

 

Municipality: San Juan City

Barangay Affected:

Greenhills, Addition Hills, Little Baguio, Pasadena, Corazon de Jesus, West Crame

 

Municipality: Pasig City

Barangay Affected:

Ugong, Oranbo, Pineda, Bagong Ilog, Kapitolyo, San Antonio

 

Municipality: Mandaluyong City

Barangay Affected:

Wack-Wack, Mauway, Addition Hills, Highway Hills, Malamig, Buwayang Bato, Barangka Ilaya, Plainview, Barangka Itaas, Barangka Ibaba, Barangka Drive, Pleasant Hills, Hulo


Posted on August 13, 2018

ActivityPutatan Water Pump Station Transformer Installation
LocationPutatan Water Treatment Plant, Putatan, Muntinlupa City
Duration
Start 3:00 pm of August 12
End 5:00 am of August 12

and

Start 3:00 pm of August 13
End 5:00 am of August 13
Start3:00 pm of August 12End5:00 am of August 12Start3:00 pm of August 13End5:00 am of August 13
Start3:00 pm of August 12
End5:00 am of August 12
Start3:00 pm of August 13
End5:00 am of August 13

The activity will cause Low Pressure to No Water supply for portions of Muntinlupa, Las Piñas and Parañaque City.

Muntinlupa City – Buli, Cupang, Alabang, Ayala Alabang, Putatan, Bayanan, Tuansan, Poblacion

Las Piñas City – Almanza Uno, Bgy. BF International /CAA, Pilar, Talon Tres

Parañaque City – Bgy. BF Homes


Posted on August 10, 2018

ActivityNetwork Maintenance Activity
LocationD. Tuazon corner E. Rodriguez
Duration
Start 10:00 pm of August 15
End 04:00 am of August 16
Start10:00 pm of August 15End04:00 am of August 16
Start10:00 pm of August 15
End04:00 am of August 16

Portions of Barangay Doña Josefa Marcos, Lourdes, Maharlika, Manresa, N S Amoranto, Paang Bundok, Saint Peter, Salvacion, San Isidro Labrador, San Jose and Santa Teresita, Quezon City will temporarily experience water interruption until the activity is completed.


ActivityNetwork Maintenance Activity
LocationC3 Road/North Bay Boulevard/H. Lopez
Duration
Start 11:00 pm of August 16
End 4:00 am of August 17
Start11:00 pm of August 16End4:00 am of August 17
Start11:00 pm of August 16
End4:00 am of August 17

Portions of Caloocan City, Navotas CIty, and Malabon City (Affected Brgys. : 12, 14, 20, 28, 31, 35, North Bay Boulevard, Bangkulasi, San Rafael, Longos) will temporarily experience no water supply until the activity is completed.


Posted on June 26, 2018

ActivityNetwork Maintenance Activity
LocationRincon Road, Pasolo Road, M. Hernadez Street, Daang Putol and Kapitan Velilla Street
Duration
Start 11:00 pm of June 26
End 04:00 am of June 27
Start11:00 pm of June 26End04:00 am of June 27
Start11:00 pm of June 26
End04:00 am of June 27

Portions of Brgys. Arkong Bato, Balangkas, Bisig, Isla, Mabolo, Malinta, Palasan, Pariancillovilla, Pasolo, Polo, Poblacion, Rincon, Tagalag, Ugong and Wawang Pulo, Valenzuela City and Obando Water District will temporarily experience no water until the activity is completed.


Posted on June 05, 2018

Maynilad is temporarily shutting down its Putatan Water Treatment Plant (“PWTP”) in Muntinlupa City starting June 6, 2018 (the “Service Interruption”).  This shutdown is necessary so that PWTP can be interconnected to the new water treatment facility that Maynilad is currently constructing in the same area. The interconnection of the two facilities is an essential step toward full completion of the new treatment plant that will enable Maynilad to improve water services for its customers in the southern portion of the West Zone concession.

As a result of this activity, some Maynilad customers in parts of Las Piñas, Muntinlupa, Parañaque, and Cavite will have low pressure to no water supply starting 11 a.m. of June 6, 2018 (Wednesday) to 5 a.m. of June 8, 2018 (Friday).   To mitigate the impact of the plant shutdown, we have water tankers on standby, ready to deliver water to affected areas upon request.

Below is the list of affected areas and their corresponding water supply interruption schedules.


Posted on June 01, 2018

Maynilad is temporarily shutting down its Putatan Water Treatment Plant (“PWTP”) in Muntinlupa City starting June 6, 2018 (the “Service Interruption”).  This shutdown is necessary so that PWTP can be interconnected to the new water treatment facility that Maynilad is currently constructing in the same area. The interconnection of the two facilities is an essential step toward full completion of the new treatment plant that will enable Maynilad to improve water services for its customers in the southern portion of the West Zone concession.

As a result of this activity, some Maynilad customers in parts of Las Piñas, Muntinlupa, Parañaque, and Cavite will have low pressure to no water supply starting 11 a.m. of June 6, 2018 (Wednesday) to 5 a.m. of June 8, 2018 (Friday).   To mitigate the impact of the plant shutdown, we have water tankers on standby, ready to deliver water to affected areas upon request.

Below is the list of affected areas and their corresponding water supply interruption schedules.


ActivityNetwork Maintenance Activity
LocationHS Legarda
Duration
Start 11:00 pm of June 05, 2018
End 02:00 am of June 06, 2018
Start11:00 pm of June 05, 2018End02:00 am of June 06, 2018
Start11:00 pm of June 05, 2018
End02:00 am of June 06, 2018

Portions of Brgys. 383, 384, 388, 390416, 419, 420, 430, 431, 433–435 and 457–461, Manila will temporarily experience low pressure to no water until the activity is completed.


ActivityNetwork Maintenance Activity
LocationCoral corner Velasquez
Duration
Start 11:00 pm of June 01, 2018
End 2:00 am of June 02, 2018
Start11:00 pm of June 01, 2018End2:00 am of June 02, 2018
Start11:00 pm of June 01, 2018
End2:00 am of June 02, 2018

Portions of Pacheco, Velasquez, Perla, and Quezon (Affected Brgys. 66, 68, 74, 119, 121) will temporarily experience water interruption until the activity is completed.


ActivityNetwork Maintenance Activity
LocationPerla corner Sta Maria
Duration
Start 11:00 pm of June 01, 2018
End 2:00 am of June 02, 2018
Start11:00 pm of June 01, 2018End2:00 am of June 02, 2018
Start11:00 pm of June 01, 2018
End2:00 am of June 02, 2018

Portions of Perla, Sta Maria, Concha, Quezon(Affected Brgys.70, 71, 72, 73, 120, 123) will temporarily experience water interruption until the activity is completed.


Posted on May 30, 2018

Activity:          Network Activity

Location:        D.Santiago corner Luzon

Duration:        Start – 11:00 pm of May 30, 2018

End – 05:00 am of May 31, 2018

Portions of area bounded by: G.Tuazon, Batanes, Luzon Ave., D.Santiago, Estero De Valencia, and Antipolo (Affected Brgys.: 555 to 559, 561 to 564, 567, 573 and 577) will temporarily experience water interruption until the activity is completed.

In reference to the notice of water interruption of Maynilad, this are the list of affected barangays that will experience no water during the Water Audit of Maynilad on 31 May (11PM) to June 1 (4AM).

Thank you.

ZoneBarangaysMunicipalityAffected WSCs
2702MANILA162
2705MANILA166
2703MANILA55
2704, 705MANILA272
2706MANILA247
2706MANILA252
2721MANILA191
2709, 710, 711, 712MANILA263
2718MANILA178
2716MANILA163
2720, 715MANILA263
2707, 708, 711, 713, 720MANILA199
2719MANILA195
2725MANILA74
2724, 726MANILA178
2726MANILA180
2724MANILA177
2744MANILA286
2731, 734MANILA295
2739MANILA168
2731MANILA154
2732, 734MANILA301
2731MANILA167
2723MANILA134
2722MANILA168
2743MANILA252
2740, 742, 743MANILA182
2740MANILA218
2750MANILA213
2740, 741MANILA186
2741MANILA189
2734MANILA93
2738MANILA161
2750MANILA196
2735MANILA189
2734, 736MANILA221
2735, 736, 737MANILA222
2736MANILA198
1694MANILA1
1675, 676MANILA109
1666MANILA119
1676MANILA95
1675MANILA167
1673MANILA89
1673MANILA94
1673MANILA131
2695MANILA144
2692, 693MANILA129
2694MANILA207
2690, 691MANILA199
2689MANILA205
2689, 695MANILA210
2694, 695MANILA138
2686MANILA299
2687, 688MANILA174
2687MANILA157
2702MANILA1
2703MANILA1
2703MANILA1
2692MANILA1
2740MANILA1
2689MANILA1
2687MANILA1
1675MANILA1
1666MANILA1
1676MANILA1
1673MANILA1
2706MANILA1
2721

Posted on May 29, 2018

Emergency Activity for today (May 29, 2018) with estimated AHH of 7000. Please see information below for reference.

Nature of WorkEmergency leak repair 300mm HDPPE
Locationalong Mabuhay homes/ Phase 2-B Brgy. Pantok, Binangonan, Rizal
Affected AreaBrgys, Darangan, Macamot, Tatala and Mambog
Background of Activity, Prework and Estimated Time of Completion (ETC)Leak repair 300mm HDPE

 

ETC at 4am 30May

Contact Details of Concessionaire’s Customer Care (IMT)OIM: Jerrry bell Serquina – 09175023804

 

SIM: Renz Arabit  – 09176730298

CIM: Joseph Perez – 09175025166

Details of Alternative Water Supply5 by 10 cu. m. water tankers

Nature of Work / Activity : Water Audit

Objective:        To assess non-revenue water in the hydraulic system

Location:        San Andres near Modesto st.

Duration:        Start – 11:00 pm of May 31, 2018

End – 04:00 am of June 1, 2018

Estimated affected water service connections: SMPM BA – 10,091

During this activity some areas in the City of  Manila will temporarily experience NO WATER. Affected areas are:

Portions of Brgys. 666, 673, 675, 676686, 687-695, 702-713,715, 716, 718-726, 731732, 734-744 and 750


Nature of Work / Activity : Network Maintenance Activity

Location:        A. Mabini Avenue corner Dimasalang Street (SOUTH)

Duration:        Start – 10:30 pm of May 31, 2018

End – 03:00 am of June 01, 2018

During this activity some areas in the City of  Manila will temporarily experience water interruption until the activity is completed. Affected areas are:

Portions of Brgys. 25, 29, 30, 32 to 35 Caloocan City


Nature of Work / Activity : Network Maintenance Activity

Location:        Dimasalang Street corner A. Mabini Avenue

Duration:        Start – 10:30 pm of May 30, 2018

End – 04:00 am of May 31, 2018

During this activity some areas in the City of  Manila will temporarily experience water interruption until the activity is completed. Affected areas are:

Portions of Brgys. 21-31, Caloocan City


Nature of Work / Activity : Water Audit of HS Rincon Primary Line

Objective:        To determine possible water losses along the Primary line

Location:        Along Rincon road, Pasolo road, M. Hernandez st., Daang Putol and Kapitan Velilla st.

Duration:        Start – 11:00 pm of May 30, 2018

End – 04:00 am of May 31, 2018

Estimated affected water service connections: Novaliches Valenzuela BA – 10,195

During this activity some areas in Valenzuela City will temporarily experience NO WATER. Affected areas are:

Barangay Malinta, Isla, Rincon, Pasolo, Tagalag, Bisig, Balangkas, Pariancillovilla, Polo, Poblacion, Palasan, Arkong Bato, Mabolo, Wawang Pulo, Ugong and Obando Water District.


Nature of Work / Activity : Network Maintenance Activity

Location:        Bonifacio Avenue corner C3 Road

Duration:        Start – 11:59 pm of May 30, 2018

End – 03:00 am of May 31, 2018

During this activity some areas in the City of  Manila will temporarily experience water interruption until the activity is completed. Affected areas are:

Portions of Brgy. 122, 125 and 126 Caloocan City, and Pag-ibig sa Nayon Quezon City


Nature of Work / Activity : Network Maintenance Activity

Location:        Evangelista/Recto

Duration:        Start – 11:59 pm of May 28, 2018

End – 03:00 am of May 29, 2018

During this activity some areas in the City of  Manila will temporarily experience water interruption until the activity is completed. Affected areas are:

Portions of Evangelista/Rizal Avenue, Ronquillo, Gonzalo Puyat, Quezon Boulevard, and Raon area


Posted on May 15, 2018

Due to the installation of a 400mm fullbore magnetic flow meter in a mainline located along Deparo Road, Maynilad has announced that there will be a water interruption from 9:00 p.m. of 16 May to 5:00 a.m. of 17 May 2018 in the following areas:

CALOOCAN CITY (North)
Brgy. 167Llano
Brgy. 168Deparo (Deparo Road, T. Samson Road, Kabatuhan Street)
Brgy. 169BF Homes (Estrella Homes, Santa Fe Homesite, BF Homes Novaliches Phase 1, and 2)
Brgy. 170Deparo 2 (Amparo Novaville, SM Homes, Cefels 2 Subdvision, BF Homes Novaliches Phase 3)
Brgy. 171Bagumbong (Bagumbong Road, Bagumbong Dulo, Taas Street, Rainbow Village 5, Bankers Village, Shelterville Subd.)
 

Posted on 25 April 2018

Activity:          Emergency Water Interruption

Location:        Brgy. Alabang, Cupang and Sucat, Muntinlupa City

Duration:        Start – 9:00 am of April 25, 2018

End- 08:00 pm of April 25, 2018


 

Posted on 23 April 2018

Activity:          Maintenance Activity

Location:        Nicanor Roxas / Iba

Duration:        Start – 10:00 pm of April 27, 2018

End- 04:00 am of April 28, 2018


Activity:          Maintenance Activity

Location:        Osmeña corner Pitimini

Duration:        Start – 10:00 pm of April 25, 2018

End – 04:00 am of April 26, 2018


Activity:          Maintenance Activity

Location:        HS EDSA Muñoz

Duration:        Start – 11:00 pm of April 26, 2018

End – 03:00 am of April 27, 2018


Activity:          Maintenance Activity

Location:        Alley 6 corner Jose Abad Santos Street Sta. Lucia Novaliches, Quezon City

Duration:        Start – 12:00 am of April 25, 2018

End – 04:00 am of April 25, 2018


Posted on 06 March 2018

Activity:           Decommissioning of 2 blow-offs of a 1400mm mainline due to the road widening project along Coastal Road

Location:         Coastal Road, Parañaque City

Duration:         Start – 12:00 nn of 07 March 2018

End – 6:00 am 08 March 2018

List of affected areas

Posted on 12 February 2018

Activity: Maintenance Activity

Location:         Primerose Street near Mayflower Street and along Primrose Street corner

Lantana, Bloomfields Subdivision

Duration:         Start – 11:00 pm of February 13, 2018

End –  4:00am of February 14, 2018


Activity: Maintenance Activity

Location:         Cabatuan Street corner Mauban Street

Duration:         Start – 11:45 pm of  February 13, 2018

End – 3:00am of February 14, 2018


Activity: Maintenance Activity

Location:         Severino Reyes corner Yuseco

Duration:         Start – 11:00 pm of February 13, 2018

End – 4:00 am of February 14, 2018


Activity: Maintenance Activity

Location:         D. Tuazon Pumping Station

Duration:         Start – 10:00 pm of February 13, 2018

End – 3:00 am of Fberuary 14, 2018


Activity: Maintenance Activity

Location:         P. Villanueva Street, San Rafael Pasay City

Duration:         Start – 11:00 pm of February 13, 2018

End – 4:00 am of February 14, 2018


Activity: Maintenance Activity

Location:         Zinc/M.H. Del Pilar

Duration:         Start – 11:00 pm of February 13, 2018

End – 4:00 am of February 14, 2018


Activity: Maintenance Activity

Location:         M. Dela Fuente / J. Fajardo (East and West) and Firmeza / Algeciras

Duration:         Start – 11:00 pm of February 13, 2018

End –  4:00 am of February 14, 2018


Activity: Maintenance Activity

Location:         Old Sta. Mesa / Teresa, Reposo / Old Sta. Mesa and Cordillera / Valenzuela

Duration:         Start – 11:00 pm of February 13, 2018

End – 4:00 am of February 14, 2018


Activity: Maintenance Activity

Location:         Gov. Pascual / Judge Roldan

Duration:         Start – 11:00 pm of February 14, 2018

End – 4:00 am of February 15, 2018


Activity: Maintenance Activity

Location:         M. Dela Fuente / R. Magsaysay Boulevard and Pureza / R. Magsaysay

(North and South)

Duration:         Start – 11:00 pm of February 14, 2018

End – 4:00am f February 15, 2018


Activity: Maintenance Activity

Location:         Tecson corner Jose Abad Santos Avenue

Duration:         Start – 11:00 pm of February 14, 2018

End – 1:00am of February 15, 2018


Activity: Maintenance Activity

Location:         Mariano Street Corner Edsa

Duration:         Start – 11:45 pm of February 14, 2018

End – 3:00 am of February 15, 2018


Activity: Maintenance Activity

Location:         Tandang Sora / General Avenue cor. Tandang Sora and Charbel Executive

Subdivision

Duration:         Start – 10:00 pm of February 14, 2018

End – 4:00 am of February 15, 2018


Activity: Maintenance Activity

Location:         Jasmin Street corner 11th Avenue

Duration:         Start – 11:45 pm of February 14, 2018

End – 3:00 am of February 15, 2018


Activity: Maintenance Activity

Location:         9th Street (North) corner 11th Avenue

Duration:         Start – 11:45 pm of February 14, 2018

End – 3:00 am of February 15, 2018


Activity: Maintenance Activity

Location:         11th Avenue corner 6th Street

Duration:         Start – 11:45 pm of February 14, 2018

End – 3:00 am of February 15, 2018


Activity: Maintenance Activity

Location:         11th Avenue (West) corner B. Serrano St.

Duration:         Start – 11:45 pm of February 14, 2018

End – 3:00 am of February 15, 2018


Activity: Maintenance Activity

Location:         Leticia Homes corner Calamansian Street

Duration:         Start – 11:00 pm of February 14, 2018

End – 4:00 am of February 15, 2018


Activity: Maintenance Activity

Location:         Block 14 near Luwalhati / Cemetery, Phase 8B

Duration:         Start – 11:59 pm of February 14, 2018

End – 2:00 m of February 16, 2018


Activity: Maintenance Activity

Location:         Apelo Cruz Extension Malibay Pasay City

Duration:         Start – 11:00 pm of February 14, 2018

End – 4:00 am of February 15, 2018


Activity: Emergency Maintenance

Location:         1st Street / Bataan, Dangal / Bagumbayan and 2nd Street / Bataan

Duration:         Start – 11:00 pm of February 14, 2018

End – 4:00 am of February 15, 2018


Activity: Maintenance Activity

Location:         CAA Road Corner J. Aguilar Street, Las Piñas City

Duration:         Start – 9:00 pm of February 14, 2018

End – 7:00 am of February 15, 2018


Activity: Maintenance Activity

Location:         M. Abad Santos / Lubiran, M. Abad Santos / M. Arellano, Mag. Arellano / Mag .

Mapa and Mag. Mapa / Mag Arellano

Duration:         Start – 11:00 pm of February 15, 2018

End – 4:00 am of February 16, 2018


Activity: Maintenance Activity

Location:         Morong corner Pilar

Duration:         Start – 1:00 am of February 15, 2018

End – 3:00 am of February 15, 2018


Activity: Maintenance Activity

Location:         Alpha Street corner Northbay Boulevard

Duration:         Start – 11:30 pm of February 15, 2018

End – 3:00 am of February 16, 2018


Activity: Maintenance Activity

Location:         Ilang-Ilang Street corner Sampaguita Street and along Rpsal Street near

Bouganvilla Street Adeline Homes

Duration:         Start – 11:00 pm of February 15, 2018

End – 4:00 am of February 16, 2018


Activity: Maintenance Activity

Location:         Langaray Street corner Dagat-Dagatan Avenue

Duration:         Start 10:30 pm of February 15, 2018

End – 3:00 am of February 16, 2018


Actvity: Maintenance Activity

Location:         Mag. Arellano / Ma. Mapa, M. Abad Santos / M. Arellano, Dangal /

Bagumbayan and Mag. Mapa / Mag Arellano

Duration:         Start – 11:00 pm of February 15, 2018

End – 4:00 am of February 16, 2018


Activity: Maintenance Activity

Location:         Jose Abad Santos Avenue corner Yuseco

Duration:         Start – 11:00 pm of February 15, 2018

End – 3:00 am of February 16, 2018