Metropolitan Waterworks and Sewerage System (MWSS) Regulatory Office Acting Chief Regulator Emmanuel Caparas and MWSS Deputy Administrator for Operations Leonor Cleofas, lead the ceremonial ribbon cutting during the inauguration of the Portal Flow Metering Systems Project at the La Mesa Portal, Fairview, Quezon City on Friday March 28, 2014. With them are Gerardo Ablaza (left), President and CEO of Manila Water Co. Inc. and Ricky Vargas (right), President and CEO of Maynilad Water Services, Inc. The Portal Flow Control System will enable real time monitoring and controlling of the water to ensure the accurate distribution of raw water from Ipo Dam.